Rack Power Up Sequence
Jump to navigation
Jump to search
Generally speaking, you start the rack from the top down.
- Turn on the network switches
- Turn on the KVM switch
- Connect the Yellowbrick blades to power then wait for fans to slow/quiet (4-5 mins to boot if blades off for 3+ days).
- Connect a KVM Crash Cart to Yellowbrick Manager node 0.
- Power up Yellowbrick Manager node 0 wait 30 seconds.
- Power up Yellowbrick Manager node 1 wait 3 minutes.
- Log into Yellowbrick as
ybdadminuser using KVM monitor. Run the following command to verify everything is running:ybcli system status
- Login to Yellowbrick SMC console from a browser as
yellowbrickat your virtual IP YB URL.In the Truxton DB this URL is configured to be http://10.10.182.103. You should see at status OK on the dashboard. - Turn on the Servers (7 through 1)
It will take several more minutes for everything to boot.