Difference between revisions of "Truxton Forensic Rack"
Jump to navigation
Jump to search
| Line 67: | Line 67: | ||
# Install rails for network switches | # Install rails for network switches | ||
# Install network switches | # Install network switches | ||
| + | # Add the hundreds of cables | ||
| + | |||
| + | ==Power Up Sequence== | ||
| + | Generally speaking, you start the rack from the top down. | ||
| + | |||
| + | # Turn on the network switches | ||
| + | # Turn on Yellowbrick Management Node 1 | ||
| + | # Turn on Yellowbrick Management Node 2 | ||
| + | # Turn on Yellowbrick server | ||
| + | |||
| + | ==Installing Software== | ||
| + | Prior to software installation, several decisions must be made | ||
| + | # Where are temporary files going to go? | ||
| + | # Where are the hashsets going to go? | ||
| + | # Where are the SOLR indexes going to go? | ||
| + | # | ||
Revision as of 12:27, 8 January 2021
The Truxton Forensic Rack is a 7 foot tall rack populated with hardware dedicated to forensic processing. It has a Yellowbrick database appliance, seven dedicated loader/exploitation machines and 1PB of usable depot storage. With everything separated, it gives us many knobs to turn for loading.
Hardware
Here's how the hardware is stacked:
| U42 | Network Switch |
| U27 | Yellowbrick |
| U26 | Yellowbrick Manager 0 |
| U25 | Yellowbrick Manager 1 |
| U23 | KVM Server |
| U22 | Keyboard and Monitor |
| U13 | Loader Node 7 |
| U11 | Loader Node 6 |
| U09 | Loader Node 5 |
| U07 | Loader Node 4 |
| U05 | Loader Node 3 |
| U03 | Loader Node 2 |
| U01 | Loader Node 1 |
Installing Hardware
Normally you won't have to do this but should you want to move the hardware out of the existing rack an into a different one, populate the new rack from the bottom up.
- Locate Server Node 1
- Install the rails for the server into the rack position
- Slide the server onto the rails
- Repeat for the remaining servers working your way up the rack
- Install rails for KVM
- Install KVM
- Install rails for Yellowbrick Management Node 1
- Install Yellowbrick Management Node 1
- Install rails for Yellowbrick Management Node 2
- Install Yellowbrick Management Node 2
- Install rails for Yellowbrick Server
- Install Yellowbrick Server
- Populate Yellowbrick Server with 9 blades
- Fill the empty spaces in Yellowbrick Server with empty blade enclosures
- Install rails for network switches
- Install network switches
- Add the hundreds of cables
Power Up Sequence
Generally speaking, you start the rack from the top down.
- Turn on the network switches
- Turn on Yellowbrick Management Node 1
- Turn on Yellowbrick Management Node 2
- Turn on Yellowbrick server
Installing Software
Prior to software installation, several decisions must be made
- Where are temporary files going to go?
- Where are the hashsets going to go?
- Where are the SOLR indexes going to go?